FutureProductions_Logo-white
  • Products
  • Highlights
  • About us
  • News
  • Insights
  • Contact

The Drilling Rig Optimization Blog

Where Rig Managers, Technical Managers and other Drilling Professionals go to learn and share their insights

  • Safety (HSE)
  • Non-Productive Time
  • FP ClickStab®
  • MPD
Tailor-made Moonpool
Standard vs Tailor-Made Moonpool Solutions: What Operators Need to Know
October, 7 2025 Aris Hegg

When drilling a well, maintaining high efficiency and safety are always the targets. The moonpool area is one of the most critical — yet often...

Read More
Cut Kill & Choke Connection Time: Faster, Safer Rig Connections
August, 11 2025 Aris Hegg

Are Kill & Choke line connections still labour intensive, time consuming and putting your crew at risk? Does weather conditions and safety concerns...

Read More
Mechanized XMT/BOP handling system improving control during offshore operations.
How Controlling Lateral Movement Expands Your Weather Window
June, 24 2025 Aris Hegg

Offshore operations are constantly at the mercy of weather. For floating rigs especially, the combination of wind, waves, and ocean currents...

Read More
Future Production Automatic Disconnect System (ADS Trigger) installed on lower flex joint above LMRP/BOP stack
Emergency Disconnects Made Safer with Future Production’s ADS Technology
May, 21 2025 Aris Hegg

In high-stakes offshore drilling, split-second decisions can mean the difference between control and catastrophe.What if your rig could make one of...

Read More
FP-ClickStab® automated connection system for MPD operations on offshore rig.
Redefining MPD Deployment: From 48 Hours to 15 Minutes with FP-ClickStab® Technology
April, 29 2025 Aris Hegg

Managed Pressure Drilling (MPD) continues to prove its value across a broader range of the drilling industry. As adoption spreads beyond complex...

Read More
FP CombiCat® horizontal pipe handling system installed on well intervention vessel – hands-free operation from driller’s cabin.
The FP CombiCat® –  Skiddable and Mobile Horizontal Pipe Handling System
April, 17 2024 Aris Hegg

Future Production is proud to have delivered the innovative and highly capable horizontal pipe handling system FP CombiCat®for a Well Intervention...

Read More
Preparations of TEWS before install
Top Entry Wireline System (TEWS) from Future Production Installed on a 8th Gen. Rig
March, 13 2024 Aris Hegg

Future Production has successfully delivered and installed a Top Entry Wireline System (TEWS) on an 8th Generation Drillship in Q1 2023.

Read More
Tailor-made moonpool handling system lowering subsea equipment through the rig’s moonpool, demonstrating precision control and safe operation in offshore drilling environments.
Pros and Cons of Standard vs Tailor-made Moonpool Solutions
November, 27 2023 Aris Hegg

When drilling a well the goal is to do so as efficiently as possible. The overall efficiency particularly depends on the rig overall capacity and how...

Read More
BOP access platform
How to Reduce Risk of Dropped Objects on an Offshore Rig
March, 23 2023 Aris Hegg

Dropped objects are among the most critical safety hazards in any worksite where activities take place at different elevations.On offshore drilling...

Read More
XMT Handling Upgrade on an old rig with tight space
How Updated Handling Systems Can Give Your Rig a Competitive Advantage
January, 18 2022 Aris Hegg

There are a range of different rig designs and generations, some are modern with up-to-date equipment, whilst other are older early generations with...

Read More
  • Pre
  • 1
  • 2
  • Next

Subscribe

Subscribe to our blog and stay updated:

FutureProductions_Logo-white

 

Tailor made products and solutions for the offshore industry.

Menu
  • Products
  • Highlights
  • About us
  • News
  • Insights
  • Contact
Subscibe
Want notifications sent directly to your mailbox?
  • Subscribe
Future Production AS
Svanedamsveien 10
4621 Kristiansand
Norway
  • Contact HQ:
  • Phone: +47 38 00 20 90
  • E-mail: post@f-p.no

Future Production AS ©2025. All rights reserved.