title: "Redefining MPD Deployment: From 48 Hours to 15 Minutes with FP-ClickStab® Technology"
description: FP-ClickStab® automates MPD mud return and control line connections. On one semi-submersible rig, the lines were operational in under 15 minutes.
image: https://blog.future-production.no/hubfs/CS-01-02-optimized-1.jpg
---

[![FutureProductions\_Logo-white](https://blog.future-production.no/hubfs/FutureProductions_Logo-white.svg "FutureProductions_Logo-white")](https://future-production.no/)

- [Products](https://future-production.no/products/)
- [Highlights](https://future-production.no/highlights/)
- [About us](https://future-production.no/about-us/)
- [News](https://future-production.no/general-information/)
- [Insights](https://blog.future-production.no)
- [Contact](https://future-production.no/about-us/contact/)

[FP ClickStab®](https://blog.future-production.no/topic/fp-clickstab) , [MPD](https://blog.future-production.no/topic/mpd)

# Redefining MPD Deployment: From 48 Hours to 15 Minutes with FP-ClickStab® Technology

[By Aris Hegg](https://blog.future-production.no/author/aris-hegg)

 April 29, 2025

- <https://twitter.com/intent/tweet?url={url}&text={title}>
- <https://www.linkedin.com/shareArticle?mini=true&url={url}&title={title}>
- <https://www.facebook.com/sharer.php?u={url}>

*Last modified: 21. November 2026*

Managed Pressure Drilling (MPD) continues to prove its value across a broader range of the drilling industry. As adoption spreads beyond complex wells into more routine operations, the focus shifts from the "why" to the "how fast and efficiently". One of the key questions operators now face is: How can we integrate MPD with less interruption of the operation timeline?

 

[![New call-to-action](https://no-cache.hubspot.com/cta/default/14562745/a5f959e2-ad6f-42e3-bcf0-986c311ec852.png)](https://cta-redirect.hubspot.com/cta/redirect/14562745/a5f959e2-ad6f-42e3-bcf0-986c311ec852)

 

 

## Why can manual MPD rig-up and rig-down take so long?

 

Historically, rigging up and down MPD systems, especially on floating rigs, has required time-consuming manual work. Connecting mud return lines and control umbilicals often demands significant effort over open sea, with safety risks and operational delays. Depending on weather conditions and crew availability, this manual process can take up to 48 hours, and in some cases, even longer.

 

These constraints delay operations and add to the total well cost. In a high-day rate offshore environment, even a few hours of delay can impact the project budget. Additionally, the reliance on specialized personnel to execute complex connections adds logistical pressure and reduces operational flexibility.

 

## How does FP-ClickStab® automate MPD connections?

 

The FP-ClickStab® technology addresses this bottleneck directly. Designed as a fully automated, remote-controlled connection of both the mud return flow lines, and control umbilicals. The result? A rig-up time of approximately 15 minutes.

 

The FP-ClickStab® technology originates from the [hands-free FP Gooseneck Handling System](https://future-production.no/products/handsfree-gooseneck-handling-system/), connecting the High-Pressure K&C, conduit and booster hoses to the Slip Joint.

 

This automation transforms MPD deployment from a major logistical hurdle to a routine task. It eliminates the need for personnel to work over open sea, significantly reducing safety risks by its hands-free operational features. Further, the system also enables the possibility to widen BOP running operational window.

 

The system's modular design also ensures compatibility with diverse SS/DS/JU vessel designs, minimizing integration time and complexity. The system can be provided as a retrofit modification to existing setup or as a completely new product.

 

 

### Key advantages

- Hands-free, automated connection of flow and control lines
- Remote operation for improved HSE performance
- Compatibility with multiple vessel types (SS, DS, JU)
- Retrofit or newbuild installation flexibility

 

 

## How much time has FP-ClickStab® saved in MPD deployments?

 

In recent deployments, FP-ClickStab® technology has demonstrated its capability to cut MPD rig-up/down time by over 95%. On a semi-submersible, for instance, the MPD/mud return lines and electrical/hydraulic control lines were fully connected and operational in under 15 minutes during a planned window. This enabled the operator to maintain momentum in the drilling sequence and avoid unnecessary downtime.

 

These results demonstrate the technical feasibility of automated hose and umbilical connections and support the commercial case for broader MPD adoption across rig fleets.

 

## What are the operational benefits of automated MPD connections?

 

The technology improves pressure control and reduces the time needed to rig up and rig down MPD systems offshore. This directly affects NPT and operating costs.

- Increased safety: no personnel working over open sea.
- Consistent deployment: reduced dependency on manual procedures.
- Lower emissions: shorter idle times contribute to ESG goals.
- Improved ROI: efficiency gains outweigh initial investment.

Related case study: [How Future Production saved our client 6 months worth of schedule slippage and idle rig expenses](https://future-production.no/how-future-production-saved-their-client-6-months-worth-of-schedule-slippage-and-idle-rig-expenses/)

 

 

## Implementing automated MPD deployment

 

As MPD becomes standard practice across a wider variety of wells, the focus must be on optimizing how it's implemented. 

 

With systems utilizing FP-ClickStab® technology, operators have a clear path to safer, faster, and more cost-effective MPD operations.

 

FP-ClickStab® can automate MPD mud return and control line connections or K&C, booster and conduit line connections.

 

## MPD deployment FAQ

 

How long can manual MPD rig-up and rig-down take?

Depending on weather conditions and crew availability, the manual process can take up to 48 hours and in some cases even longer.

How quickly were the MPD lines connected on a semi-submersible?

In the semi-submersible example, the MPD mud return lines and electrical and hydraulic control lines were fully connected and operational in under 15 minutes during a planned window.

Which MPD connections does FP-ClickStab® automate?

FP-ClickStab® provides fully automated, remote-controlled connection of mud return flow lines and control umbilicals.

Can FP-ClickStab® be retrofitted to an existing setup?

Yes. The system can be provided as a retrofit modification to an existing setup or as a completely new product.

 

[![New call-to-action](https://no-cache.hubspot.com/cta/default/14562745/f0bb95ea-aa79-4e5c-9b63-5abc719bf947.png)](https://cta-redirect.hubspot.com/cta/redirect/14562745/f0bb95ea-aa79-4e5c-9b63-5abc719bf947)

[All posts](https://blog.future-production.no)

###### About Author

[Aris Hegg](https://blog.future-production.no/author/aris-hegg)

With over 30 years of experience within offshore drilling technology, Aris offers insights that can help optimize rig safety and performance. His engineering and sales experience contributes to understanding the specific client requirement, project infrastructure and conditions.

##### You might also like

![Cut Kill & Choke Connection Time: Faster, Safer Rig Connections](https://blog.future-production.no/hubfs/DSC03462-(002).jpg)

[Cut Kill & Choke Connection Time: Faster, Safer Rig Connections](https://blog.future-production.no/cut-kill-choke-connection-time-faster-safer-rig-connections)

 April 29, 2025

##### SUBMIT YOUR COMMENT

### Subscribe

##### Subscribe to our blog and stay updated:

[![FutureProductions\_Logo-white](https://blog.future-production.no/hubfs/FutureProductions_Logo-white.svg "FutureProductions_Logo-white")](https://future-production.no/)

 

Tailor made products and solutions for the offshore industry.

##### Menu

- [Products](https://future-production.no/products/)
- [Highlights](https://future-production.no/highlights/)
- [About us](https://future-production.no/about-us/)
- [News](https://future-production.no/general-information/)
- [Insights](https://blog.future-production.no)
- [Contact](https://future-production.no/about-us/contact/)

##### Subscibe Want notifications sent directly to your mailbox?

- Subscribe

##### Future Production AS Svanedamsveien 10 4621 Kristiansand Norway

- Contact HQ:
- [Phone: +47 38 00 20 90](Tel:004738002090)
- [E-mail: post@f-p.no](mail:post@f-p.no)

Future Production AS ©2026. All rights reserved.

<https://www.linkedin.com/company/future-production-a-s/> <https://www.youtube.com/channel/UC9ZRbUQFXZ_b49e80QzjhLQ>

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab#article",
  "@type" : "BlogPosting",
  "about" : [ {
    "@type" : "Thing",
    "name" : "Managed Pressure Drilling (MPD)"
  }, {
    "@type" : "Thing",
    "name" : "Offshore automation"
  }, {
    "@type" : "Thing",
    "name" : "Non-Productive Time reduction"
  }, {
    "@type" : "Thing",
    "name" : "Health, Safety and Environment (HSE)"
  } ],
  "author" : {
    "@type" : "Person",
    "name" : "Aris Hegg",
    "url" : "https://blog.future-production.no/author/aris-hegg"
  },
  "dateModified" : "2026-11-21",
  "datePublished" : "2025-04-29",
  "description" : "FP-ClickStab® automates mud return and control line connections for managed pressure drilling (MPD). In one semi-submersible deployment, the lines were connected and operational in under 15 minutes.",
  "headline" : "Redefining MPD Deployment: From 48 Hours to 15 Minutes with FP-ClickStab® Technology",
  "image" : [ "https://blog.future-production.no/hubfs/CS-01-02-optimized-1.jpg" ],
  "inLanguage" : "en",
  "isAccessibleForFree" : true,
  "mainEntityOfPage" : {
    "@id" : "https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.future-production.no/hubfs/FutureProductions_Logo-white.svg"
    },
    "name" : "Future Production",
    "url" : "https://future-production.no/"
  },
  "url" : "https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab"
}
```

```json
{
  "@context" : "https://schema.org",
  "@id" : "https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab",
  "@type" : "FAQPage",
  "inLanguage" : "en",
  "mainEntity" : [ {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Depending on weather conditions and crew availability, the manual process can take up to 48 hours and in some cases even longer."
    },
    "name" : "How long can manual MPD rig-up and rig-down take?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "In the semi-submersible example, the MPD mud return lines and electrical and hydraulic control lines were fully connected and operational in under 15 minutes during a planned window."
    },
    "name" : "How quickly were the MPD lines connected on a semi-submersible?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "FP-ClickStab® provides fully automated, remote-controlled connection of mud return flow lines and control umbilicals."
    },
    "name" : "Which MPD connections does FP-ClickStab® automate?"
  }, {
    "@type" : "Question",
    "acceptedAnswer" : {
      "@type" : "Answer",
      "text" : "Yes. The system can be provided as a retrofit modification to an existing setup or as a completely new product."
    },
    "name" : "Can FP-ClickStab® be retrofitted to an existing setup?"
  } ],
  "url" : "https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab"
}
```