---
title: The Drilling Rig Optimization Blog | MPD
description: MPD | Offshore drilling technology and tools for the moonpool area. Insights to optimise rig performance for better NPT, Safety and Environment.
---

[![FutureProductions_Logo-white](https://blog.future-production.no/hubfs/FutureProductions_Logo-white.svg "FutureProductions_Logo-white")](https://future-production.no/)

- [Products](https://future-production.no/products/)
- [Highlights](https://future-production.no/highlights/)
- [About us](https://future-production.no/about-us/)
- [News](https://future-production.no/general-information/)
- [Insights](https://blog.future-production.no)
- [Contact](https://future-production.no/about-us/contact/)

# The Drilling Rig Optimization Blog

#### Where Rig Managers, Technical Managers and other Drilling Professionals go to learn and share their insights

- [Safety (HSE)](https://blog.future-production.no/topic/safety-hse)
- [Non-Productive Time](https://blog.future-production.no/topic/non-productive-time)
- [FP ClickStab®](https://blog.future-production.no/topic/fp-clickstab)
- [MPD](https://blog.future-production.no/topic/mpd)

[![Tailor-made Moonpool](https://blog.future-production.no/hubfs/MoonpoolGuide.jpg)](https://blog.future-production.no/standard-vs-tailor-made-moonpool-solutions-what-operators-need-to-know)

[Standard vs Tailor-Made Moonpool Solutions: What Operators Need to Know](https://blog.future-production.no/standard-vs-tailor-made-moonpool-solutions-what-operators-need-to-know)

 October, 7 2025 [Aris Hegg](https://blog.future-production.no/author/aris-hegg)

When drilling a well, maintaining high efficiency and safety are always the targets. The moonpool area is one of the most critical — yet often...

[Read More](https://blog.future-production.no/standard-vs-tailor-made-moonpool-solutions-what-operators-need-to-know)

[![FP-ClickStab® automated connection system for MPD operations on offshore rig.](https://blog.future-production.no/hubfs/CS-01-02-optimized-1.jpg)](https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab)

[Redefining MPD Deployment: From 48 Hours to 15 Minutes with FP-ClickStab® Technology](https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab)

 April, 29 2025 [Aris Hegg](https://blog.future-production.no/author/aris-hegg)

Managed Pressure Drilling (MPD) continues to prove its value across a broader range of the drilling industry. As adoption spreads beyond complex...

[Read More](https://blog.future-production.no/redefining-mpd-deployment-from-48-hours-to-15-minutes-with-fp-clickstab)

- [Pre](https://blog.future-production.no/tag/mpd/page/0)
- [Next](https://blog.future-production.no/tag/mpd/page/0)

### Subscribe

##### Subscribe to our blog and stay updated:

[![FutureProductions_Logo-white](https://blog.future-production.no/hubfs/FutureProductions_Logo-white.svg "FutureProductions_Logo-white")](https://future-production.no/)

 

Tailor made products and solutions for the offshore industry.

##### Menu

- [Products](https://future-production.no/products/)
- [Highlights](https://future-production.no/highlights/)
- [About us](https://future-production.no/about-us/)
- [News](https://future-production.no/general-information/)
- [Insights](https://blog.future-production.no)
- [Contact](https://future-production.no/about-us/contact/)

##### Subscibe Want notifications sent directly to your mailbox?

- Subscribe

##### Future Production AS Svanedamsveien 10 4621 Kristiansand Norway

- Contact HQ:
- [Phone: +47 38 00 20 90](Tel:004738002090)
- [E-mail: post@f-p.no](mail:post@f-p.no)

Future Production AS ©2026. All rights reserved.

<https://www.linkedin.com/company/future-production-a-s/> <https://www.youtube.com/channel/UC9ZRbUQFXZ_b49e80QzjhLQ>